Riff Raff Racing  

Available for air shows!  Contact us at riffrafflc@juno.com

Home
News/Results
Aircraft History
Photo Gallery
Team Riff Raff
Facelift Phase 1
Facelift Phase 2
Paint Phase
Race Results
With the majority of the reskinning work completed, phase 2 begins.  The new exhaust system is in-house and ready for installation, and outer wing panels and flight controls are being prepared for painting.

Above and below:

Left wing re-skin

during and after


Above and below:

R wing tip fairing

reinstalled after

repair

Stripping panels


Above and below:

Outer wing panels

removed

Wing panels in

A frame supports





Above and below:

Exhaust system before

New R side exhaust system

fitted and Tack welded

into place


Major flight controls

have been removed

from the tail.