|
With the majority of the reskinning work completed, phase 2 begins. The new exhaust system is in-house and ready for installation, and outer wing panels and flight controls are being prepared for painting.
|
Above and below: Left wing re-skin during and after
|
Above and below: R wing tip fairing reinstalled after repair Stripping panels
|
Above and below: Outer wing panels removed Wing panels in A frame supports
|
|
|
|
Above and below: Exhaust system before New R side exhaust system fitted and Tack welded into place
|
Major flight controls have been removed from the tail.
|
|
|
|
|